Free PC Support
PC Help Forums from the Experts at Technical-Assistance.co.uk
 
Google
 
Search The Web Search This Site
 RSS FeedRSS Feed   FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister   ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Flooring installation preparation

 
Reply to topic    Free PC Support Forum Home -> Helproom
Author Message
qizhenapp



Joined: 08 Jun 2016
Posts: 199

PostPosted: Tue Sep 13, 2016 5:49 am    Post subject: Flooring installation preparation Reply with quote

1. Detection Ground Flatness: between the highest and lowest points within 2 meters high and low error should not exceed 3mm.

2. Test the moisture content of the ground: Common ground installation Floors moisture content requirement of 20% or less, the laying of geothermal systems installed in the ground floor before the moisture content requires controlled within 10%.

3. Check concealed underground engineering (eg: line pipes, water pipes, electric heating, plumbing, kitchen and bathroom with water and other office), whether there is water leakage, power is normal, and keep the floor clean.

4. floor mats must be dedicated grid floor before paving roofing membrane moisture, moisture-proof film thickness of about 2mm. When the pad shop, there are moisture-proof film is literally facing the long side aligned with each other and not overlap, lap paste tightly with adhesive stickers; four weeks against the wall baseboard location for an extended reservation 2cm neatly scribed to ensure that moisture film laid into place, forming a whole.

When installing geothermal floor, it must be parallel to the pavement 5. Heaters Heaters Heaters way stripe direction and intermediate heaters can not have more than 50mm intervals, intermittent use of heaters or floor bagging easily lead away from the seam.

6. Requests the pavement in front of the floor color, texture to be adjusted again after laying the effect of customer acceptance before paving.

7. room use electric heating or plumbing, covering the surface layer of cement must be opened to warm baked seven days before the floor pavement. Avoid excessive moisture due to the concrete floor, floor and furniture of life.

the article come from:white composite lumber for sale

maybe you also like:
available planing plastic planter boxes
meticulous wood fence design ideas
looks like real wood decking for backyard
Back to top
View user's profile Send private message
Display posts from previous:   
Reply to topic    Free PC Support Forum Home -> Helproom All times are GMT
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum

 



Powered by phpBB © 2001, 2005 phpBB Group

2005 - 2017 All Rights Reserved www.technical-assistance.co.uk
Terms and Conditions